Tierra SolarSolar PV and storage

For landownersYour land can earn you rent for 30 years*.

We lease all or part of your land to install a solar PV plant or an energy storage facility. The land stays yours and permitting is on us. It all starts with a free study that tells you which project your land can host.

At a glance

Leased area
from 200 m² to over 50,000 m²
Term
up to 30 years*
Cost to you
none
Land ownership
stays with you

* General guidance. Areas, durations and rents depend on the country, local rules and the type of project your land can host: solar PV, storage or both. We study your land for free before any offer.

What we look for*

In France, Spain, Italy and Bulgaria.

BESS

For a storage project

  • From 200 m², on industrial or agricultural land.
  • Close to the power grid.
  • Access for installation and maintenance.
PV

For a solar PV project

  • Usually from one hectare, flat or gently sloping and well exposed.
  • A substation or power line within reasonable distance.
  • Outside protected areas; on farmland, subject to each country’s rules.

* Indicative criteria, varying by country and local regulations.

What you receive

  • An annual rent agreed in writing for the full term.
  • No costs: grid studies, design, licences and permitting are at our expense.
  • The rest of your plot stays yours to use: only the fenced area is leased.
  • At the end of the lease, dismantling and land restoration are set out in writing.

From first contact to lease, step by step

  1. Send us the location

    The cadastral reference or simply the municipality and plot.

  2. We verify the land

    Grid, zoning and constraints. We tell you frankly whether it fits.

  3. Visit and written offer

    We visit the plot and send you an offer with the rent and terms.

  4. Lease option

    A first contract reserves the land while we obtain the permits.

  5. Permitting

    Permitting times vary by country. We keep you informed at every step.

  6. Notarised lease

    Once permits are granted, the lease is executed before a notary.

Frequently asked questions

Is my land suitable?

Send us its location. We study the grid, planning and environment for free, and tell you whether it can host solar PV, storage or both.

Is it noisy?

A solar PV plant is silent. For storage, the only sound comes from equipment ventilation, designed to stay within local limits.

Is it safe?

Equipment complies with the country’s fire and electrical regulations, with detection, suppression, fencing and safety distances. The project is checked by the municipality and the competent authorities.

Can I keep using my plot?

Yes. We only lease the area needed, which is fenced. The rest remains yours to use.

What if the project doesn’t go ahead?

If permits are not obtained, the option ends and you get full use of your land back, at no cost.

What happens at the end of the lease?

The contract provides for dismantling the equipment and restoring the land.

Landowner brochure
Two pages to keep or share.
Download the brochure (PDF)
Contact

Let’s talk about your land, your municipality or your project.

We reply within two working days. Your data is used only to answer you and is never shared.

Email
contact@tierrasolar.eu

Tierra Solar EDPK, a single-member variable-capital company incorporated in Bulgaria
11A Dedeagach St., entrance V, floor 4, apt. 77, 1000 Sofia (Bulgaria)