Ground-mounted and rooftop solar PV
Our team develops ground-mounted and rooftop solar PV projects, from site survey to grid connection.
We develop solar PV and energy storage projects that strengthen the power grid, on land and rooftops that stay in their owners’ hands.
Our team develops ground-mounted and rooftop solar PV projects, from site survey to grid connection.
Battery energy storage systems (BESS) from 1 MW up to more than 50 MW, developed through to ready-to-build.
From land to ready-to-build: studies, permits, grid connection and contracts, on our own account or for our partners.
A catalogue of more than 2,000 plots and a close reading of grid capacity, to place each project where the grid can take it.
A storage facility takes up the space of one or a few shipping containers. No engines, no fumes: it charges and discharges as the grid needs.
Solar plants produce more than is consumed. The facility stores the surplus instead of wasting it.
The facility returns the stored energy to the grid, exactly when homes and businesses need it most.
It responds in a fraction of a second to hold voltage and frequency. Across Europe, grid stability has become a priority, especially since the Iberian blackout of 28 April 2025.
For storage and for solar PV, from 200 m² to more than 5 hectares. Studies and permitting are on us.
See the terms MunicipalitiesA small footprint, noise and fire rules met, revenue for the municipality and a single point of contact throughout the project.
See the benefits PartnersFor operators, IPPs and developers: greenfield projects, sourcing of ready-to-build projects and equity stakes, across four European markets.
See the modelGrid capacity, medium-voltage line, land registry, zoning and environmental constraints.
Site visit, written terms and a signed lease option.
Project presentation and zoning confirmation before any application.
Application to the grid operator, under each country’s connection regime.
Local permits and regional or national authorisations, depending on the country and land type.
Connection agreement signed and lease executed before a notary: the project is ready to build.
* Steps, timelines and permits vary by country and type of project.
Our company is headquartered in Sofia. We develop projects where the grid needs new capacity and flexibility.
Solar PV · storage
Solar PV · storage
Solar PV · storage
Solar PV · storage
Our team brings together energy project development specialists: land, planning, grid engineering, permitting and contracts. We verify before promising, put the terms in writing and follow every file through to connection.
Land prospecting, negotiation and file management.
Substation capacity, connection and sizing.
Land compatibility, studies and permit applications.
Grid, cadastre and planning data cross-checked and updated continuously.
Terna holds the second auction of the MACSE mechanism, for 16 GWh of storage to be delivered in 2029.
Source : Review Energy
Order TED/966/2026, published in the BOE, opens the capacity market to storage, with contracts of up to 15 years for new projects.
Source : Osborne Clarke · Energías Renovables
According to ENTSO-E data, battery storage capacity grew by 1 GW in one month to 5.4 GW, close to 23% of the power fleet.
Source : TaiyangNews
Stockage Énergie France is founded as the first professional body for stationary storage, estimating a need for more than 6 GW connected by 2030.
Source : ESS News
We reply within two working days. Your data is used only to answer you and is never shared.
Email
contact@tierrasolar.eu
Tierra Solar EDPK, a single-member variable-capital company incorporated in Bulgaria
11A Dedeagach St., entrance V, floor 4, apt. 77, 1000 Sofia (Bulgaria)